ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2007: Optimizing design of injection-production parameters of steam injection development of heavy oil in ultra-thin layer in Jinglou and Gucheng oilfields. Petroleum Geology and Engineering, 21(03): 70-71+74+11.
Citation: 2007: Optimizing design of injection-production parameters of steam injection development of heavy oil in ultra-thin layer in Jinglou and Gucheng oilfields. Petroleum Geology and Engineering, 21(03): 70-71+74+11.

Optimizing design of injection-production parameters of steam injection development of heavy oil in ultra-thin layer in Jinglou and Gucheng oilfields

  • Based on the analysis of reservoir characteristics and oil properties,producing reserves of heavy oil resources in ultra-thin layer of Jinglou and Gucheng oilfields are eval- uated and numerical geologic model is established. Through optimization design of injection-production pa- rameters of steam injection development of heavy oil in ul- tra-thin layer and the experimentation of mineral re- sources,the exploitation of heavy oil in 1-3 m of Jinglou and Gucheng oilfields is applicable.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return