ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
Du Lian. 1998: Application of A new Rock Drillability Testing Method in the Jingjiang Fault Block, Jianghan Basin. Petroleum Geology and Engineering, 12(03): 25-28+60.
Citation: Du Lian. 1998: Application of A new Rock Drillability Testing Method in the Jingjiang Fault Block, Jianghan Basin. Petroleum Geology and Engineering, 12(03): 25-28+60.

Application of A new Rock Drillability Testing Method in the Jingjiang Fault Block, Jianghan Basin

  • Drillability-energy-testing is a new method to test rock drillability by use of cuttings. This paper discusses its principle and technological process and presents the results in the Jingjiang Fault Block, Jianghan Basin.Field application shows that the testing cost is low and the results are good.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return