ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
Chen Xiaoqin, Lu Guangyu et al, . 1999: Deepen Design Reform and Control Capital Construction Investments. Petroleum Geology and Engineering, 13(06): 53-55+61.
Citation: Chen Xiaoqin, Lu Guangyu et al, . 1999: Deepen Design Reform and Control Capital Construction Investments. Petroleum Geology and Engineering, 13(06): 53-55+61.

Deepen Design Reform and Control Capital Construction Investments

  • This paper analyzes the problems existed in capitalconstruction investments, and presents ways to implementquota designing, establish new design system and controlcapital construction investment. They include adopting newdesign concept, strengthening idea of economic benefit andconsciousness of investment risk, estab1ishing quota workresponsibility system, completing capital constructionmanagement system and quota system, and implementingquota design in the whole design process.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return