ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2010: Study of the initial well production line of adjusted wells in overseas A oilfield. Petroleum Geology and Engineering, 24(06): 73-75+141.
Citation: 2010: Study of the initial well production line of adjusted wells in overseas A oilfield. Petroleum Geology and Engineering, 24(06): 73-75+141.

Study of the initial well production line of adjusted wells in overseas A oilfield

  • Different overseas oilfield development and production projects have different tax provisions.The contract requires different models for different development strategies.In this paper,the A oil field abroad has been set as example,the oilfield development to adjust the initial well production line has been studied in accordance with the country tax provisions and project negotiable result,which provided support for the adjusted well deployment of later stage development.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return