ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2013: Fracturing operation analysis and treatment measures of Nantun reservoir of Hailaer oilfield. Petroleum Geology and Engineering, 27(04): 103-104+149.
Citation: 2013: Fracturing operation analysis and treatment measures of Nantun reservoir of Hailaer oilfield. Petroleum Geology and Engineering, 27(04): 103-104+149.

Fracturing operation analysis and treatment measures of Nantun reservoir of Hailaer oilfield

  • Due to deep reservoir burial depth , uneven distribution of formation stress and fault impact , as well as high hydraulic fracturing pressure , sand plug is easy to be caused which has a bad influence on fracturing effect.Therefore , a series of fracturing controlling methods have been adopted to reduce construction pressure.The application results indicate it has achieved good effect.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return