ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2009: Overall evaluation of recovery ratio at high water cut of water-drive reservoir. Petroleum Geology and Engineering, 23(03): 68-70+7.
Citation: 2009: Overall evaluation of recovery ratio at high water cut of water-drive reservoir. Petroleum Geology and Engineering, 23(03): 68-70+7.

Overall evaluation of recovery ratio at high water cut of water-drive reservoir

  • On the basis of modifying the calculation method of water -drive dynamic reserve,examples of water-drive reservoir are discussed for the study on the overall evaluation of recovery ratio at high water cut of water-drive reservoir to rationally evaluate the current and the finally recovery ration. Accordingly,the development limit of reservoir is demonstrated, which offers the basis for development adjustment.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return