ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2008: A method for predicting water-cut rate of water-drive oilfield. Petroleum Geology and Engineering, 22(05): 61-62+11.
Citation: 2008: A method for predicting water-cut rate of water-drive oilfield. Petroleum Geology and Engineering, 22(05): 61-62+11.

A method for predicting water-cut rate of water-drive oilfield

  • On the base of Model Gompertz of the economic increase and oil and gas resources increase prediction,the model of predicting water-cut rate in response to the variation of de- velopment time is established for water-flood oil field.The application in Daqing oilfield and Shengli oilfield indicate that the model can predict water-cut rate in the overall progress with simple calculation and relatively accurate precision of prediction.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return