ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2001: Resarch and Application of Injection-production Pressure System Adjustment in Block Wei 10. Petroleum Geology and Engineering, 15(03): 26-28+2.
Citation: 2001: Resarch and Application of Injection-production Pressure System Adjustment in Block Wei 10. Petroleum Geology and Engineering, 15(03): 26-28+2.

Resarch and Application of Injection-production Pressure System Adjustment in Block Wei 10

  • In view of the problems such as serious plane and in-terlayer inhomogeneity large difference of waterflooding status under-injection at high injection pressure and lacking of energy several measures are applied including fine reservoir characterizationuse of dense well spacing in microstructures and reinterpretation of log data and reservoir numerical modeling. The injection-production system is optimized development index improved and waterflooding control and producing reserves enlarged.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return