Methods to Estimate Productivity of the Hydraulically -fractured layer
-
Abstract
This paper introduces two kinds of methods for estimating productivity of fractured layer. The estimated results have been compared with actual pFoduQtivity,errors were 16.2% and 17.2% respectively, and the causes were analyzed. The methodS, which were proven suitable and cffective, have been utilized to the selection of fracturing layers.
-
-