ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2011: Case study on wells interference and technical measures in infill well fracturing. Petroleum Geology and Engineering, 25(01): 95-97+145.
Citation: 2011: Case study on wells interference and technical measures in infill well fracturing. Petroleum Geology and Engineering, 25(01): 95-97+145.

Case study on wells interference and technical measures in infill well fracturing

  • Xinchang shaximiao gas reservoir is one of the main gas reservoir in southwest field,which has entered intermediary and later stage of production decline at present.Parameters optimization of infill well fracturing has been proposed for post fracturing response to guarantee fracturing effects,includeing target fracture length,gravel inputting scale,pre-liquid ratio,average sand ratio,and delivery capacity after development adjustment applications.Optimiza-tion technology is successfully applied to seven wells such as well CX606,which success rate is 100%.Good effect of increase production has been acquired by the technology with-out well interference providing an effective technology for infill well fracturing in xinchang shaximiao gas reservoir.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return