ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2002: Application of Actual Water-cut Escalating Rate in Production Forecast. Petroleum Geology and Engineering, 16(06): 31-32+2.
Citation: 2002: Application of Actual Water-cut Escalating Rate in Production Forecast. Petroleum Geology and Engineering, 16(06): 31-32+2.

Application of Actual Water-cut Escalating Rate in Production Forecast

  • There are many production forecast methods at the medium and late stages of waterflooding.However,the pa-rameter value selection is difficult,and calculation is com-plex.A new method for predicting interval oil production is presented in this paper by utilizing interval fluid production and interval water-cut escalating rate.The interval water-cut is achieved through fitting of the actual water-cut esca-lating rate values in Cartesian coordinates.This method is simple and practical.Field application shows that the cal-culation results are reliable.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return