ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
2013: Optimization design of cyclic steam stimulation parameters with the combination of vertical and horizontal wells. Petroleum Geology and Engineering, 27(03): 120-123+150.
Citation: 2013: Optimization design of cyclic steam stimulation parameters with the combination of vertical and horizontal wells. Petroleum Geology and Engineering, 27(03): 120-123+150.

Optimization design of cyclic steam stimulation parameters with the combination of vertical and horizontal wells

  • The S-block is a low-middle porosity and low-middle permeability reservoir.The steam stimulation pilot test shows that the steam stimulation technology is suitable for S-block.By using the numerical simulation method to optimize the steam huff and puff development mode and injection-production parameters,the study results show the development effect with the combination of vertical and horizontal wells is the best,the length of horizontal interval is 300 m,and the injection-production wells row spacing and vertical well spacing is both 100 m.The downhole steam dryness must be more than 40%,the steam injection rate is about 360 m3/d,vertical and horizontal wells' cyclic injection intensity is 60 t/m,10 t/m,the injection volume is 1 800 m3,3000 m3,the steam injection pressure is above 18 MPa,and the soak time is about 6 days.The study can provide reliable basis for the similar reservoirs in the optimization of development mode and injection-production parameters.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return