ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
1996: An Approach to Setting up "AH Weather" Electric Network in Henan Oilfield. Petroleum Geology and Engineering, 10(04): 34-36+5-6.
Citation: 1996: An Approach to Setting up "AH Weather" Electric Network in Henan Oilfield. Petroleum Geology and Engineering, 10(04): 34-36+5-6.

An Approach to Setting up "AH Weather" Electric Network in Henan Oilfield

  • According to the requirement to set up "all weather" electric network,existing problems such as uncomplcting overvoltage protection, lower standard of design, unfit project and poor ability of resisting natural disaster in network of Henan Oilfield, this paper makes analyses and suggests five measures to solve these problems.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return